Duowei TDM, TDV steel truss deck is also as know as composite steel deck with rebar truss. Steel truss deck is a composite template which is welded into one combination by the steel truss and galvanized steel rolled-plate, and the steel truss is welded by rebar in the shop. In the construction phase, the steel truss deck can sustain the construction loads, and be laid on the beam directly, then do some simple rebar work, pouring concrete. The steel truss deck replaces the template without setting and demolition, so improve the construction efficiency.

How to Install Duowei Steel Truss Deck

 

 

Product Elements

 

The TDM,TDV steel truss deck is formed by the upper rebar, lower rebar, web rebar, deck and support rebar.

 

Specification

 

Upper, lower rebar: Grade 3 coiled hot-rolled HRB400 or cold-rolled ribbed Grade CRB550.

 

Web rebar: cold-rolled plain rebar.

 

Deck steel plate : galvanized steel plate, the thickness is 0.4-1.0mm (TDV) \ 0.4-0.7mm (TDM) , and the zinc content on both sides should not be less than Z120 grade.

111
2

Datasheet

 

The diameter of upper & lower rebar

6-14mm

The diameter of web rebar

4-7mm

The height of the truss

70-270mm

The diameter of the Horizontal support rebar

10mm(h ≤ 100mm),12(h>100mm)

The diameter of the Vertical support reba

12mm(h ≤ 100mm),14(h>100mm)

The thickness of the deck

0.4~1.0mm(TDV)\ 0.4~0.7mm(TDM)

The width of the deck

576\590\600mm(TDV) \ 590mm(TDM)

The thickness of protective concrete

15mm,20mm,25mm,30mm

The length of the steel truss deck

1.0-11.8m

 

Duowei. Steel Truss Deck/Steel bar truss deck

 

A floor plate product which can increase customer value.

  • We cut out the factors which could lead to an increase in the cost of materials.

The purpose of profiled sheet is changed, and it is just used as the template in construction stage of floor plate, reducing the used amount of profi led sheet and lowering requirements on anti-corrosion coating of profiled sheet.

  • We change the stress mode of floor plate during construction stage

In construction stage, stiffness is provided by steel bar truss instead of by profiled sheet. Thus, greater stiffness of floor plate can be provided, applicable to larger floor plate span without supporting.

  • We reduce the cost of customer maintenance in later period.

Profiled sheet is used only as template in construction stage, without need to deal with fire resistance. It is no need for its anti-corrosion to meet the requirements of service life of buildings. Therefore, it is no need to consider the cost of maintenance.

 

Steel truss deck with double folds is one-of-a-kind

 

22
  1. The strength of the deck edge is effectively enhanced, then the edge is not easily bent when transiting and laying.
  2. It ensures the edge straight, then the deck is easily connected.
  3. The connecting compactness is enhanced to prevent leaking concrete grout.
  4. It enhances the construction quality and guarantees the profi t of customers.

 

The advantage of the TDM steel bar truss deck/Steel Truss Deck

 

"M" type up-right rib steel truss deck is one-of-a-kind

  • The supper load capacity of welding joint

The width of the "M" type up-right rib is 2-3mm, so the welding load capacity of it is 1.5 times of the traditional "v" type.

  • The supper durabilit

The distance between the welding joint and deck is 5mm, so the surface of the deck has no weld point, no rust point, the corrosion resistance is better than the TDV steel bar truss deck, it avoids the possibility of repair in service stage.

  • Avoid leaking grout

Due to the deck none weld point, then there is no welding hole on the deck, so it will not leak the grout.

 

The application area of the TDM Steel Truss Deck/ steel bar truss deck

 

4
  1. The cleanness shop without ceiling;
  2. The IAQ is required such as hospital, laboratory.
  3. The beach cities which have high humidity and salinity;
  4. The public outside buildings without ceiling;
  5. The high-grade office building to be sold directly before ceiling.

The application area of the TDV steel bar truss deck

 

The multi story steel shop and public building with ceiling or without special requirement.

 

Installation Node Handlin

66
55
77

Installation and Construction Process of Steel Truss Deck

8
Duowei steel truss deck installation process in the steel structure building
-1
Steel truss deck installation process in the reinforcement concrete structure building

Hot Tags: steel truss deck, China steel truss deck manufacturers, suppliers, factory, Glass wool sandwich panel, sandwich panel mineral wool, mineral wool sandwich panel, Sandwich Panel Glass Wool for Roof, steel deck truss, pre engineered steel floor deck